Monday, February 16, 2015

The Green Engineer Spotlight

Cambridge Center Expansion
Biogen Idec


When Biogen Idec decided to locate their 204,000 sf expansion in Kendall Square, they also decided to work with an all-star cast of design, construction and real estate professionals. The project was developed by Boston Properties, designed by Elkus Manfredi, and built by Lee Kennedy Co. The Green Engineer helped to ensure the building attained LEED Gold certification for Core + Shell. The new office and lab space is linked to the existing Biogen building by a two-level connector structure, and is also powered by an existing steam plant.


The project earned 63 points, reducing indoor water use by 30%, potable water use in irrigation by 50%, achieving a 16% improvement in baseline building performance, using recycled building materials, and specifying FSC-certified wood products. For more details on the energy-saving features of the project check out the LEED scorecard here.











No comments:

Post a Comment

Thank you for your comments, they will be posted shortly.
Please note that we will not post any that contain solicitations.